Y2  price  made in China - replacement parts -  in Cuttack India  Yx3 Ye2 Yzr Series Electric Motor AC with top quality

We – EPG Group the biggest gearbox & motors , couplings and gears manufacturing unit in China with 5 different branches. For far more details: Mobile/whatsapp/telegram/Kakao us at: 0086~13083988828 13858117778083988828

Y2 Motor Features

Electric powered motor frame from 56 – 355, output variety from .17HP to 430HP.Motor mounting type B3 (IM 1001), B35 (IM 2001), B5 (IM 3001), B14 (IM 3601), B34 (IM 2101) Protection kind IP44, IP54, IP55 on ask for .Several mounting arrangement for optional .Aluminum body, stop shields and base Strong forged iron body ,Substantial toughness cable,Shaft essential and protector provided ,Superior paint end . steel shaft and stainless metal shaft is optional.Electric powered motor continuous responsibility S1,motor have vocuum impregnation for insulation, motor is course F insulation and course H insulation is optional.motor has been make in accordance to ISO9001, CE, UL, CCC, GS request All of our goods are make according to GOST, RoHS and IEC common.Substantial efficiency and IE1, IE2, IE3 effectiveness / IE1 Strength SAVEING,IE2 – High Efficiency,IE3 Top quality Effectiveness.

2.Specifications

1. Silicon metal DR510, 800, 600, 360 normal use stamping of lamination stator and rotor die-casting
2. one hundred% copper winding and inserting stator (guide and semi-automatically)
three. Stator Vacuum impregnation and drying
4. CNC machining motor shaft, frame, end shields, and so on
5. Professional workman inspecting spare areas each processing
6. Electrical motor assembly product line
7. Electrical motor will one hundred% examination just before painting. 
eight. Electrical motor spray-paint on motor portray solution line
9. Electrical motor will one hundred% check out again just before packing. 
An electric powered motor from materials to end motor, must pass fifteen time verify, and a hundred% testing, output energy, voltage, electrical recent, non-load, fifty% load, seventy five% load, 100% load and check out the nameplate, packing. Finally shipping and delivery to our consumer.

Complex Knowledge

TYPE Output Current (A) Speed Eff. Power
Element
Ist/In Tstart/Tn Tmax/Tn
KW HP 380V 400V r/min %
Y2E1-631-two .18 .twenty five .53 .50 2720 sixty five .8 five.five two.two two.two
Y2E1-632-two .25 .34 .sixty nine .66 2720 68 .81 6.five 2.2 two.two
Y2E1-711-2 .37 .five .ninety nine .94 2740 70 .81 seven 2.2 two.two
Y2E1-712-two .fifty five .75 1.40 one.33 2740 73 .eighty two seven 2.2 2.three
Y2E1-801-2 .seventy five one one.83 1.74 2830 seventy five .eighty three 7.five two.two two.three
Y2E1-802-2 one.1 1.5 2.58 2.45 2830 seventy seven .eighty four 7.nine 2.2 2.three
Y2E1-90S-two one.5 2 3.forty three 3.26 2840 79 .eighty four 7.five two.2 two.3
Y2E1-90L-two 2.2 3 4.eighty five four.61 2840 81 .eighty five seven.five two.two 2.three
Y2E1-100L-two three four 6.31 six.00 2870 eighty three .87 7.5 2.2 two.3
Y2E1-112M-two four five.five eight.12 7.72 2880 eighty five .88 seven.5 two.two two.3
Y2E1-132S1-two 5.five 7.five eleven.04 ten.forty nine 2900 86 .88 seven.5 two.2 2.3
Y2E1-132S2-2 7.5 10 fourteen.88 fourteen.fourteen 2900 87 .88 7.5 two two.3
Y2E1-160M1-2 eleven fifteen 21.34 20.27 2940 88 .89 seven.5 2 two.3
Y2E1-160M2-2 15 twenty 28.77 27.33 2940 89 .89 7.five 2 two.three
Y2E1-160L-2 eighteen.5 twenty five 34.70 32.97 2940 ninety .nine seven.5 2 2.three
Y2E1-180M-two 22 thirty 41.27 39.twenty 2940 ninety .9 7.five two two.2
Y2E1-200L1-two 30 forty 55.53 52.75 2950 ninety one.2 .9 7.5 2 2.two
Y2E1-200L2-two 37 50 sixty seven.89 64.50 2950 ninety two .9 seven.five 2 2.two
Y2E1-225M-two forty five 60 eighty two.13 78.02 2970 ninety two.3 .9 seven.five 2 two.2
Y2E1-250M-2 55 75 99.eighty four 94.85 2970 ninety two.five .9 seven.5 two two.two
Y2E1-280S-two seventy five a hundred 134.ninety eight 128.23 2970 93 .9 7.five 2 two.two
Y2E1-280M-2 ninety a hundred twenty five 161.63 153.fifty five 2980 ninety three.8 .nine seven.5 2 two.2
Y2E1-315S-2 110 one hundred fifty 194.35 184.sixty three 2980 94 .91 seven.1 1.8 2.two
Y2E1-315M-2 132 a hundred and eighty 232.ninety seven 221.32 2980 94.five .ninety one seven.one 1.eight two.2
Y2E1-315L1-two 160 220 278.seventy three 264.79 2980 94.6 .92 seven.one 1.8 two.two
Y2E1-315L2-two 200 270 346.fifty eight 329.25 2980 94.eight .92 seven.one one.eight 2.2
Y2E1-355M-2 250 340 431.87 410.27 2980 95.3 .ninety two 7.one 1.6 2.2
Y2E1-355L-2 315 420 544.15 516.ninety four 2980 ninety five.6 .ninety two seven.1 1.six two.2
Y2E1-631-4 .twelve .sixteen .44 .forty two 1310 57 .72 five.2 two.four 2.two
Y2E1-632-4 .18 .25 .sixty two .59 1310 60 .73 five.two 2.4 2.2
Y2E1-711-4 .twenty five .34 .seventy nine .seventy five 1330 sixty five .74 5.two two.4 two.2
Y2E1-712-4 .37 .5 1.thirteen one.08 1330 67 .seventy four 5.two 2.4 two.2
Y2E1-801-four .fifty five .75 one.55 1.forty seven 1440 seventy one .76 five.7 2.4 2.three
Y2E1-802-4 .seventy five one 2.03 one.ninety three 1440 73 .seventy seven six 2.three two.three
Y2E1-90S-four one.1 one.5 two.89 two.75 1400 seventy five .77 6 two.three 2.3
Y2E1-90L-4 one.5 two 3.70 3.fifty one 1400 seventy eight .79 6 two.three two.3
Y2E1-100L1-4 2.two three five.sixteen four.90 1430 80 .81 7 two.three two.3
Y2E1-100L2-4 3 4 6.78 6.forty four 1430 eighty two .eighty two 7 two.three two.3
Y2E1-112M-four four 5.5 8.eighty two 8.38 1435 eighty four .eighty two 7 2.three 2.three
Y2E1-132S-4 5.5 7.5 11.84 eleven.twenty five 1440 85 .eighty three 7 2.3 two.3
Y2E1-132M-four seven.5 10 fifteen.fifty nine 14.eighty one 1440 87 .eighty four 7 two.3 two.three
Y2E1-160M-four eleven fifteen 22.sixty one 21.48 1470 88 .eighty four seven two.2 two.3
Y2E1-160L-four 15 twenty 30.13 28.sixty two 1470 89 .85 7 two.two 2.3
Y2-180M-4 eighteen.5 25 36.eleven 34.31 1460 ninety.5 .86 7 two.2 two.three
Y2-180L-four 22 30 42.71 40.58 1460 ninety one .86 7.5 two.2 two.3
Y2-200L-4 thirty forty 57.61 54.73 1470 92 .86 7.five two.two 2.3
Y2-225S-4 37 fifty 69.85 66.36 1470 ninety two.5 .87 7.five two.2 2.three
Y2-225M-four 45 60 84.68 eighty.45 1470 92.8 .87 7.5 2.two two.3
Y2-250M-4 55 seventy five 103.28 98.twelve 1470 93 .87 seven.2 two.2 2.3
Y2-280S-four 75 one hundred 139.sixty four 132.sixty five 1480 93.eight .87 7.two 2.2 2.three
Y2-280M-four 90 125 166.eighty five 158.fifty one 1480 94.two .87 seven.2 2.two 2.3
Y2-315S-4 a hundred and ten one hundred fifty 200.97 a hundred ninety.92 1480 94.5 .88 7.two 2.2 two.3
Y2-315M-four 132 one hundred eighty 240.forty 228.38 1485 94.eight .88 7.two 2.one 2.three
Y2-315L1-four a hundred and sixty 220 291.09 276.fifty four 1485 ninety four.9 .88 6.nine 2.one 2.three
Y2-315L2-4 two hundred 270 359.40 341.43 1485 ninety five .89 6.9 two.one two.3
Y2-355M-4 250 340 442.85 420.seventy one 1490 ninety five.three .nine six.9 two.one two.two
Y2-355L-4 315 420 556.24 528.43 1485 95.six .9 six.9 2.one 2.2
Y2E1-711-six .18 .twenty five .74 .70 850 56 .66 4 1.nine two
Y2E1-712-6 .25 .34 .ninety five .90 850 59 .68 four 1.nine 2
Y2E1-801-6 .37 .5 one.30 1.23 890 62 .seven four.7 one.nine two
Y2E1-802-6 .fifty five .75 one.seventy nine one.70 890 65 .seventy two 4.7 1.9 two
Y2E1-90S-six .seventy five 1 2.18 two.07 910 72.7 .72 5.five two two.1
Y2E1-90L-six 1.one 1.five 3.01 2.86 910 76 .73 5.5 two two.one
Y2E1-100L-six one.five two three.eighty five three.65 940 seventy nine .75 5.5 2 two.1
Y2E1-112M-six two.two 3 five.43 five.sixteen 940 eighty one .seventy six six.5 2 two.1
Y2E1-132S-6 3 four seven.31 six.ninety five 960 82 .76 6.five two.1 2.1
Y2E1-132M1-6 four five.5 9.fifty two 9.04 960 84 .76 six.5 two.one two.one
Y2E1-132M2-six 5.five seven.5 twelve.sixty two 11.ninety nine 960 86 .seventy seven 6.5 2.1 2.one
Y2E1-160M-6 7.five ten sixteen.ninety one sixteen.07 970 87.5 .77 six.5 two 2.one
Y2E1-160L-6 eleven fifteen 23.18 22.02 970 89 .eighty one 6.5 2 2.1
Y2E1-180L-6 fifteen 20 31.26 29.70 980 90 .eighty one six.five 2.1 2
Y2E1-200L1-6 eighteen.5 twenty five 37.sixty three 35.75 980 ninety .eighty three 6.5 2.one two
Y2E1-200L2-six 22 30 43.25 41.09 980 92 .84 7 2.one 2
Y2E1-225M-6 thirty 40 fifty seven.thirty 54.forty three 980 92.five .86 7 2.1 two
Y2E1-250M-six 37 50 70.44 sixty six.92 980 ninety two.8 .86 7 two two
Y2E1-280S-6 forty five sixty eighty five.03 80.seventy eight 990 93.5 .86 7 2 two
Y2E1-280M-six fifty five 75 103.fifty nine ninety eight.41 990 93.eight .86 seven 2 two
Y2E1-315S-6 seventy five a hundred 139.34 132.37 990 ninety four .87 6.7 2 2
Y2E1-315M-6 90 one hundred twenty five 168.seventy nine a hundred and sixty.35 990 ninety four.two .86 6.seven 2 2
Y2E1-315L1-six one hundred ten 150 200.ninety seven one hundred ninety.ninety two 990 ninety four.5 .88 6.seven 2 2
Y2E1-315L2-6 132 180 240.sixty six 228.sixty two 990 ninety four.seven .88 six.7 one.9 two
Y2E1-355M1-6 one hundred sixty 220 292.01 277.forty one 990 94.six .88 6.7 one.nine 2
Y2E1-355M2-6 200 270 363.86 345.67 990 94.9 .88 6.7 one.nine two.one

 

Why us? 
 

one.Low MOQ: It can meet your advertising business extremely effectively.
  
two.Very good Services : We treat consumers as pals,supplying 24 hrs a days 7days a week services help.

 3.Great Quality :We have stringent top quality manage method.Great popularity in the industry.
 
four.Rapidly & Cheap Supply: We have massive low cost from forwarder.

FAQ

Q: Do you supply OEM service?

A: Yes 

Q: What is your payment term?

A: thirty% T/T in advance, 70% harmony when receiving B/L copy.  Or irrevocable L/C.

Q: What is your lead time?

A: About thirty days soon after getting deposit or unique L/C.

The use of original gear manufacturer’s (OEM) portion figures or logos , e.g. CASE® and John Deere® are for reference needs only and for indicating product use and compatibility. Our organization and the outlined substitute components contained herein are not sponsored, authorized, or created by the OEM.

Y2  price  made in China - replacement parts -  in Cuttack India  Yx3 Ye2 Yzr Series Electric Motor AC with top quality

Y2  price  made in China - replacement parts -  in Cuttack India  Yx3 Ye2 Yzr Series Electric Motor AC with top quality